Quote:
Originally Posted by Roderick Usher
Here's another question - how long does it take to finish a first draft? I've written over 20 feature-lentgh scripts (the first 5 were terrible) most on spec, some for hire. My partner and I usually take 1 month to finish a first draft, but the film we have going into production this month wes written in 10 days...
|
I think a month is about right for a first draft with a final draft being finished within three months. Though, I can see that having a writing can speed things up with the old "two heads are better than one" thing.
I did write 60pgs in four days once because I was on a deadline. The last fifteen pages or so turned out a little campy because my brain had gone to mush by then.